(Last updated on: October 15, 2015)
To run a comp report for a run of a show, do the following:
- In Wintix, click on Reports | by Show | Run of performance | <Choose show>.
- Choose the check box labeled One category only.
- Choose the appropriate category. If you have designated a comp with a letter, choose that letter. If you have used the “0” – zero, then click on the down arrow and choose zero, then click Run the report.
- If you want to run a report for just a single performance, follow the same procedure above, except choose Single performance rather than Run of show.
Here’s an example of what the report looks like: